- Drilling Rig[10]
- Alternative Energy Generators[1]
- Other Metal Processing Machinery[9]
- Other Mining Machinery[6]
- Pumps[1]
- Diesel Generators[5]
- Mining Machinery Parts[10]
- Steel Pipes[10]
- Metallurgy Machinery Parts[4]
- Pipe Fittings[4]
- Other Wire Mesh[1]
- Other Metals & Metal Products[8]
- Cast & Forged[5]
- Stainless Steel Pipes[6]
- Drill Bit[5]
- Other Machine Tools Accessories[1]
- Other Machinery[3]
- Material Handling Equipment Parts[1]
- Other Hand Tools[1]
- Other Material Handling Equipment[1]
- Other Tools[1]
- Contact Person : Ms. dongying haixin
- Company Name : Dongying Haixin Petroleum Equipment Co., Ltd.
- Tel : 86-546-7755039
- Fax : 86-546-7718801
- Address : Shandong,Dongying,hekou economic development zone
- Country/Region : China
- Zip : 257000
ZJ 30 electric drill rig
MODEL | ZJ30/1700D | ZJ30/1700DB |
Nominal drilling depth | 5250∼9850ft 1600∼3000m (4 1/2"DP )4920∼8200ft 1500∼2500m ( 5"DP) | 5250∼9850ft 1600∼3000m(4 1/2"DP)4920∼8200ft 1500∼2500m (5"DP) |
Max. hook load | 382000lps 1700kN | 382000lps 1700kN |
Max. drill stem load | 225000lps 1000 kN | 225000lps 1000 kN |
Drawworks speed steps | 750HP 550kw | 750HP 550kw |
Drawworks speed steps | 4/stepless | stepless |
Main brake model |
| Hydraulic disk brake/band brake |
Auxiliary brake model |
| Eddy current brake/ETN brake |
Wirelind diameter | 1-1/8" 29mm | 1-1/8" 29mm |
Crown sheaves number and travelling sheaves number | 6×5 | 6×5 |
Open diameter of rotary table | 20-1/2" 520.7mm | 20-1/2" 520.7mm |
Rotary table drive type |
| Independent drive |
Mast type | "K" | "K" |
Clear height of mast | 134ft 41m | 134ft 41m |
Substructure height | 16.4ft(5m)19.7ft(6m)24.6ft(7.5m) | 16.4ft(5m)19.7ft(6m)24.6ft(7.5m) |
Clear height of substructure | 12.4ft(3.76m)15.6ft(4.76m)20.5ft(6.26m) | 12.4ft(3.76m)15.6ft(4.76m)20.5ft(6.26m) |
Power of single mud pump | 1000HP 735kw | 1000HP 735kw |
Mud pump sets | 2 | 2 |
Type of driving | AC-SCR-DC | AC-VFD-AC |
Power of main diesel | 1632HP 1200kw | 1632HP 1200kw |
Main diesel sets | 3 | 3 |
Total volume of mud tank | 1500BBL 240 m3 | 1500BBL 240 m3 |
ZJ 30 electric drill rig